LIST OF COMPLETED MAJOR PROJECTS

S.NO.Name of the CustomerNature of WorkCompleted Value (In lakhs)Year of Completion
1M/S NCC LTD -LUCKNOWCONSTRUCTION OF NEW INTEGRATED PASSENGER TERMINAL BUILDING AT CCS INTERNATIONAL AIRPORT,LUCKNOW.7.682019
2M/S AG GROUP -KOLKATAPILING WORK FOR DOING BOTH TEST & WORKING PILES FOR “MERCHANTILE (RETAIL) CUM BUSINESS BUILDING “ OF 1000 &1500 DIA6.262019
3M/s. NCC Ltd – AKIVEEDUInstallatin of Bored cast-in-situ piles of dia 1.2M for major and minor bridges between Moturu and Bhimavaram town stations of South Central Railway1047.392018
4M/s. NCC Limited – ChennaiPiling work for Chennai Metro Rail Project .1306.262018
5M/s. ITD Cementation India Ltd – MumbaiConstruction of Diaphragm Wall at Kolkata Metro333.082018
6M/s. NCC Ltd – AMARAVATHIInstallation of 1200mm dia Bored Cast-In-Situ piles for construction of Seed Capital Access Road Project CRDA Package –I, Amaravathi, Guntur District305.092017
7M/s. NCC Ltd – NAGPURInstallatin of Bored Cast-In-Sity piles of dia 1.2M for Nagpur Metro Rail Project3453.872017
8M/s. AMBUJA NEOTIA – KOLKATAInstallation of Bored Cast-In-Situ piles of 1.0M dia for Luxury Tower A&E at Mukundapur, Kolkata -WO- I1037.502017
9M/s. NCC Limited – KolkataPile Foundation work for IIT Kargpur Buildings at Kolkata218.142016
10M/s. NCC Limited – ChennaiPile Foundation Work for ONGC342.502016
11M/s. NCC Limited – ISRO, SharSriharikotaPile Foundation Work for SVAB for Shar, Sriharikota for ISRO611.002016
12M/s. Shapoorji&PallonjiCo.LtdPile Foundation work for CRDA Project, Amaravathi150.002016
13M/s. SEW Infrastructure LtdEQ-1A Berth Const. at VPT, Visakhapatnam480.002016
14M/s. NCC LtdConst. of Bored Cast-in-situ Piles of Flyover at Agartala Piling Work632.002016
15M/s. NCC Ltd – BMRCLInstallatin of Bored Cast-In-Sity piles of dia 1.2M for Bangalore Metro Rail Project Reach 4B365.002016
16M/s. Contec Syndicate Private Limited –HydPile Foundations for Bridge Across Nagavalli River Near Srikakulam330.052015
17M/s. NCC Limited -Lingarajapuram1000 & 750 mm dia piles for Flyover and Underpass BDA Stone378.002014
18M/s. ITD Cementation India Ltd – MumbaiConstruction of Diaphragm Wall Ennore Port-Chennai225.002014
19M/s. NCC Limited, Thermal Power Plant at Nellore – A.P.900mm,750mm & 600mm RCC Piles 370000 RM/10500 Nos9800.002013

LIST OF MAJOR RUNNING PROJECTS

S.NO.Name of the CustomerNature of WorkWork Order Value (In lakhs)Work Completed %Year of Starting
1M/s Merlin Projects LimitedConstruction of Statesman House1.13Just Started2020
2M/s. TATA PROJECTS LIMITEDGround improvement work using Non-vibratory stone column Method and Band Drains (PVD) Techniques128.4835% COMPLETED2018
3M/s. RKEC LIMITED“CONSTRUCTION OF 4 LANE BRIDGE (2X12.5m WIDE TWIN TWO LANE STRUCTURE) OVER RIVER GANGA DOWN STREAM OF FARRAKA BARRAGE INCLUDING APPROACHES CONNECTING FARAKKA RAIGHANJ SECTION OF NH-34 FROM KM 290.940 (DESIGN CHAINAGE 0.00KM to 296.805km)(DESIGN CHAINAGE 5.486km) IN THE STATE WEST BENGAL”15.5460% COMPLETED2018
4M/S NCC LTD – NAGPURPILING WORK FOR CONST OF AXIS CONTROLLED NAGPUR, MUMBAI SUPER COMMUNICATION EXPRESS WAY (MAHARASHTRA TO SAMRUDDIMAHAMARG)2.4860%2019
5M/s. ACC LIMITEDAXIS PERSONNEL MANAGEMENT PVT LTD PREMISES NO: IID-10 (PLOT NO :AA-IID MOUZA-RECJUANI ,J.LNO -13,RAJARHAT BISHNUPUR -1 G.P UNDER NEW TOWN POLICE STATION .(LAND MARK :AUSTIN HONDA)4.21YET TO START2019